Dosage Form | Installed Capacity |
Tablets: | 1000.00 Million Units |
Capsules: | 600.00 Million Units |
Liquid Orals: | 13.500 Million Units |
Dry Syrup: | 4.500 Million Units |
External Preparation: | 30.00 Million Units |
Once you have decided on outsourcing the manufacturing work to us, then we require approved brand names and formulas from you in writing along with other documents as listed in list of documents for pharmaceutical third party manufacturing. After finalization of the agreement, there are four phases of starting a “marketed by” set up:
• Formulation approval from DRUG department which takes about 5-7 days
• Procurement of Printed Packing material like foils, cartons, labels which takes 10-20 days
• Actual Production- 10-15 days
• Transportation 2-7 days.
1. Profile:
(Brief Profile with Copy of PAN Card of the company and a Copy of Memorandum & Articles of Association in case of Pvt. Ltd or limited Company. Partnership deed/ Affidavit for proprietary in case of Partnership firm or Proprietorship firm.)
2. Name, Address & Telephones with copy of Aadhar Card and Pan Cards.
(Of all Directors, Partners or Proprietor both official and residential.)
3. Copy of Resolution for Authorized Signatory to Deal:
(For limited, private limited and partnership companies)
4. Drug Licenses:
(Attested copy of Drugs Licenses to be provided)
5. GSTIN Registration Certificates.
(Attested copy of GST Registration Certificate to be provided)
General Policy of working out cost of the product is given below:
1. Cost of Raw-Materials- Active and Excipients.
2. Cost of Packaging Material-
a. PRIMARY (Printed Packaging Material- Foil, Cartons, Labels),
b. SECONDARY (PVC, Shippers, Tape, Packing Slips, Strips Etc)
3. Batch Charges- which covers cost of consumables, Quality control Costs & Local transportation.
4. In Process loss for RM & PM.
5. CC &PC.
Nutshell our inventory charges are:
Taxation and Outward Transport:
1. TAX: GST @ 12.0% is charged for drugs and @18% is charged for Food products as per latest central Govt. Exemption Notification.
2. Outward Transportion: Outward Transport is payable by the Party, the rates quoted by us are Ex-factory.